• Coordination and execution of overall installation matters of Generator (procedures, resources etc.)
• Planning & coordination of overall installation schedule, NCR management
• Definition and allocation of clear tasks for installation & Commissioning to contractor manpower
• Preparation & review of installation sequence/procedure for Generator
• Preparation of specification for installation work and finalization plan with cross function
• Preparation of installation check lists, joint inspection with client and issue of work completion certificates
• Testing and commissioning coordination with commisisoning team
• Coordination for Generator efficiency test and closure of punch points etc
• Task is to monitor and update of micro installation schedule activities w.r.t agreed Installation Schedule and update Installation Schedule on weekly basis.
• Report the criticalities well in advance to construction manager and site manager.
• Compilation of material shortages w.r.t erection (completeness of the job) and inform & follow-up the shortages with PM/ SE /Installation Engineers.
• Prepare & report the Daily progress reports on agreed formats and communicate to project team on regular basis.
• Monitor all internal and external milestones and will report to the Site Manager/System Engineer as soon the milestone is achieved.
• Ensure that all the protocols related to milestones submitted to the Site Manager.
• Ensure monthly site progress related to milestones and billing break-up is prepared, verified (from concerned supervisor) and submitted to the PM/CPM/SE for the purpose of raising monthly invoices.
• Keep track and strong follow-up of material delivery to site as per agreed erection schedule with System Engineers.
• Oversee tool list for Generator assemblies and contractor as per the site planning and two-month advance intimation to be given to the concerned.
• Control of documentation for availability of all erection and technical documents (WPS, PQR, Procedures and Protocols etc.) prior to start of erection.
• Preassembly works at service bay like stator core stacking and winding, rotor rim stacking and pole assembly, electrical testing on stator and rotor, Lower bracket assembly and Upeer bracket assembly. • Main installation activities inside generator barrel like Lowering of lower bracket, levelling and alignment wrt to Turbine shaft free, stator lowering in to pit, levelling and alignment, rotor lowering, upper bracket lowering, levelling and alignment, rotor dynamic levelless checks, unit axis alignment, shaft coupling. Combined alignment, generator auxiliaries installation align with associated piping and instrumentations, dry commissioning tests and wet commissioning tests on Generator.
Ascent Human Solutions (P) Limited is a 23 years old leading HR company in India offering end-to-end Human Resources Management Services and have been serving its clients that include MNCs and Big Indian Corporate.
Ascent Human Solutions Pvt. Limited
Ascent Human Solutions Pvt. Limited
Er's Associate
Ascent Human Solutions Pvt. Limited
Ascent Human Solutions Pvt. Limited